What the Public Record Shows: McKinney Site-Plan Case 25-0081SP

A primary-source brief on the McKinney Islamic Association site plan — organized by issue. Every claim links to the City's own record.
Case 25-0081SP (SITE2025-0081) Final vote City Council · Aug 4, 2026 · consent Site Virginia Pkwy & Crutcher Crossing (~5.57 ac) Updated 2026-07-30
What this is. LION examines whether the City applied its own rules. It makes no claim about any religious community and no accusation against the applicant; where the record is silent, it says so. Not legal advice. Every citation links to its public source, and every original is preserved unchanged in LION's archive.

The record in eight minutes. Every claim on screen is a public document, cited below.

Update & correction · 2026-07-30

Readers checked our math — and made this stronger.

An earlier version of this brief read the plan’s building numbers as footprints and said the two-story buildings roughly doubled the 15,000-sq-ft cap. Two readers flagged it, and they were right: those numbers are gross floor areas, so the masjid sits at the cap, not over it. We corrected it — with thanks. Then we pulled the City’s own submittal files and found something bigger: the masjid was originally filed at 15,903 sq ft, over the cap, and the approved plan carries it at exactly 15,000 — the largest building sitting right on the line. That’s issue ① below.

The same masjid building labeled 15,903 sq ft on the original 2025-10-06 submittal and exactly 15,000 sq ft on the approved plan sheet dated 2026-04-21
The same building, two numbers. Left: original submittal (2025-10-06), “15,903 SQ FT,” 903 over the cap. Right: approved plan sheet (dated 2026-04-21), exactly 15,000. Both are the City’s own files, archived and hash-verified: original · approved · evidence manifest.

The case at a glance

Applicant / useMcKinney Islamic Association — religious assembly
ZoningPD-O (Office), Ord. 97-05-34 as amended 2017-04-041
Masjid15,000 sf · 46 ft · 2 stories
Classroom bldg10,236 sf · 38 ft · 2 stories
Gymnasium7,337 sf · 35 ft · 1 story
P&Z (recommendation)2026-07-14 · 7–0–0 · consent
City Council (final action)2026-08-04 · consent agenda
2024 rezone (to lift the cap)Recommended denial → withdrawn

The issues — tap any to open

Four issues where the record does not, on its face, show the plan complies — each expandable to the full detail and the primary sources. Everything that does check out is folded in below, for fairness.

What checks out — the parts of this plan that meet the code on their face

We’re reading the public record in the open.

Two readers already caught an error and made this brief stronger. If you see a number that doesn’t add up, a sheet that contradicts another, or a rule we’ve read wrong — tell us. We’ll check it, fix it publicly, and credit you.

Flag something that doesn’t make sense → Every correction is logged in the open. That’s the point.

See it in the City’s own systems

You don’t have to take our word for the zoning. The City’s live map still attaches the 1997 PD to this exact parcel today — a repealed ordinance would not appear. And here are the two approved sheets the issues above turn on.

City of McKinney live zoning map showing the parcel zoned PD, governed by Ordinances 2017-04-041, 1997-05-34 and 1997-05-33
The City’s live zoning layer, at this parcel. Returns PD (Planned Development), governed by Ordinances 2017-04-041, 1997-05-34, and 1997-05-33. (Aerial: Esri. Zoning/parcel: City of McKinney GIS.)
Look up this parcel on the City’s public zoning map → Approved site plan (C-2.0) → Landscape plan (L1.01) →

The approval path — what happens next

Aug 4 is one gate, not the last — plat, mandatory traffic study, and permits still lie ahead

The Aug 4 Council vote fixes the ground-level layout under the existing PD zoning; it authorizes no construction. Because the tract is unplatted, several code-required steps remain — and that is where the traffic study becomes mandatory.

1 · Site plan  in progress
P&Z recommendation (7–0–0, 2026-07-14) → Council final action 2026-08-04 (file 25-0081SP2). After Council acts, under UDC §203F.2 only the applicant or the Director of Planning may appeal (7 days); third parties have no administrative appeal.
2 · Plat (initial)  not yet filed
The unplatted tract must be platted before any improvement permit (UDC §301(e)) or utility connection (Tex. Loc. Gov’t Code §212.012). No plat case appears in the City’s records as of this writing.
3 · Traffic Impact Analysis  triggered at the plat
Required for >100 peak-hour trips (Engineering Design Manual §2.13.C) and must be “submitted and approved prior to the submittal of a final plat” (UDC §305.B.3.c.XVIII).
4 · Construction plans → building permits
Civil plans approved and improvements accepted before the plat records (UDC §302.B); permits trigger fire-code / occupant-load review and impact fees.

Records requests you can adopt

The internal documents that would settle these questions aren’t public — but you can help pry them loose. Each request below lives on LION’s Open Records board: adopt one and LION files it with the City as your authorized agent — at no cost, and without your legal name. Each asks for a single record, so they’re quick for the City to answer. You can adopt more than one.

Open the board in a new tab →

Documents cited

Every source is a public record, linked directly. Originals are mirrored in LION’s hash-verified archive.

Highlighted from the primary source. LION highlight added to the City's own record.